Scope Creep
Starts Before Day One

Three tools for locking scope, costing changes, and running cleaner jobs

Change-Order Cost Calculator

Enter your project parameters and see what unmanaged scope additions actually cost, both as a share of the contract and as effective hourly rate erosion. Money is shown as an index where the contract = 100.

Project Parameters

Include prep, shoot, and post hours
Hours absorbed without a change order

Cost of Unmanaged Scope

Effective hourly rate (scoped, contract = 100 over all hours) ,
Effective hourly rate (actual, same index) ,
Unbilled scope addition hours ,
Unbilled scope addition value ,
Extra revision rounds (unscoped) ,
Unbilled revision value ,
Total absorbed without billing 0%
Running the numbers...

The Scope Decision Tree

A client just asked for something that wasn't in the original scope. Answer five questions to find out if it's a change order, a conversation, or a quick yes.

Should This Be a Change Order?

Answer each question honestly. The output is a recommended action, not a legal position.

Question 1 of 5
Is the request explicitly described in the approved scope of work or signed contract?
Question 2 of 5
Will fulfilling this request require additional hours, crew, equipment, or third-party costs beyond what was priced?
Question 3 of 5
Is this request coming from someone with contract approval authority on the client side?
Question 4 of 5
Have revision rounds for this phase already been exhausted?
Question 5 of 5
How does saying yes to this without a change order affect the relationship long term?
Proceed
This falls within your scoped deliverables. Do the work.
The request is within your agreed scope, involves no additional cost, and comes from an authorized party. Fulfill it as scoped and document the completion clearly so the round count stays accurate.
Absorb with documentation
Acknowledge the addition in writing before you do it.
For a high-value repeat client, absorbing this addition makes business sense. But send a brief email noting what you are doing: "We're adding [X] as a goodwill addition to this project, this falls outside the original scope but we want to take care of it for you. This does not reset the revision count or create a precedent for future scope." Protect the record.
Pause and clarify scope
The scope language is unclear. Resolve the ambiguity before working, not after.
Do not start work until you have written agreement on whether this is in-scope or not. Send a brief note: "Before we proceed, I want to confirm that [X] is included in the original scope. Based on the SOW, I read it as [in / out of] scope. Can you confirm in writing so we're aligned?" This is not confrontational, it's professional.
Issue a Change Order
This is out of scope. Price it and present a change order before work begins.
The request is outside the agreed scope, adds real cost, and/or comes from an unauthorized party. A change order is the correct tool. It should include: what is being added, the cost and timeline impact, and a signature line for written approval. Do not begin the additional work until the change order is signed. "We'd love to make this happen, here is how we price it."

Revision Round Cost Reference

What each additional round of revisions actually costs, shown in hours at the base post rate (1.0x), with 1.5x and 2.0x for higher-rate editors. Numbers assume a 3-5 hour editor session per round for a :60 spot with standard complexity.

Round Status Typical Hours Cost at 1.0x rate Cost at 1.5x rate (base-rate hrs equivalent) Cost at 2.0x rate (base-rate hrs equivalent) Notes
Round 1 Included 3–5 hrs 0 (scoped) 0 (scoped) 0 (scoped) Editor's first pass; major structural feedback
Round 2 Included 2–4 hrs 0 (scoped) 0 (scoped) 0 (scoped) Refinement; performance and timing notes
Round 3 Change Order 2–3 hrs 2 to 3 hrs 3 to 4.5 base-rate hrs equiv. 4 to 6 base-rate hrs equiv. Often triggered by new stakeholder entering approval
Round 4 Change Order 2–4 hrs 2 to 4 hrs 3 to 6 base-rate hrs equiv. 4 to 8 base-rate hrs equiv. Creative reversal zone; original brief may be shifting
Round 5 Change Order 3–5 hrs 3 to 5 hrs 4.5 to 7.5 base-rate hrs equiv. 6 to 10 base-rate hrs equiv. Brief has usually changed. Requires a conversation.
Round 6+ Change Order 4–8 hrs 4 to 8 hrs 6 to 12 base-rate hrs equiv. 8 to 16 base-rate hrs equiv. Structural rethink. Likely a brief or approval chain problem.

Pre-Job Scope Checklist

Before any project goes to contract. Check all items before the first invoice goes out. Unchecked boxes are where scope disputes come from.

Discovery Questionnaire
Primary deliverable named and platform confirmed
Total deliverable count confirmed (including cutdowns and aspect ratios)
Approval chain identified, who has final sign-off?
Budget range or ceiling discussed
Union or non-union status confirmed
Legal review or regulatory requirements noted
0 / 6
Scope of Work
All deliverables named by format, duration, and platform
Shoot days, prep days, and wrap time explicitly stated
Revision round count written into the document
Delivery format spec confirmed (codec, resolution, frame rate)
Client vs. production company responsibilities split
Exclusions section written and visible
0 / 6
Change Order Protocol
Change order process explained to client before signing
Written approval requirement stated in contract
Client approval window defined (e.g., 48 business hours)
Kill fee schedule included and signed
Overage authorization limit stated (e.g., client must approve any cost above an agreed amount)
Contract signed by authorized party (not just internal champion)