Enter your project parameters and see what unmanaged scope additions actually cost, both as a share of the contract and as effective hourly rate erosion. Money is shown as an index where the contract = 100.
A client just asked for something that wasn't in the original scope. Answer five questions to find out if it's a change order, a conversation, or a quick yes.
Answer each question honestly. The output is a recommended action, not a legal position.
What each additional round of revisions actually costs, shown in hours at the base post rate (1.0x), with 1.5x and 2.0x for higher-rate editors. Numbers assume a 3-5 hour editor session per round for a :60 spot with standard complexity.
| Round | Status | Typical Hours | Cost at 1.0x rate | Cost at 1.5x rate (base-rate hrs equivalent) | Cost at 2.0x rate (base-rate hrs equivalent) | Notes |
|---|---|---|---|---|---|---|
| Round 1 | Included | 3–5 hrs | 0 (scoped) | 0 (scoped) | 0 (scoped) | Editor's first pass; major structural feedback |
| Round 2 | Included | 2–4 hrs | 0 (scoped) | 0 (scoped) | 0 (scoped) | Refinement; performance and timing notes |
| Round 3 | Change Order | 2–3 hrs | 2 to 3 hrs | 3 to 4.5 base-rate hrs equiv. | 4 to 6 base-rate hrs equiv. | Often triggered by new stakeholder entering approval |
| Round 4 | Change Order | 2–4 hrs | 2 to 4 hrs | 3 to 6 base-rate hrs equiv. | 4 to 8 base-rate hrs equiv. | Creative reversal zone; original brief may be shifting |
| Round 5 | Change Order | 3–5 hrs | 3 to 5 hrs | 4.5 to 7.5 base-rate hrs equiv. | 6 to 10 base-rate hrs equiv. | Brief has usually changed. Requires a conversation. |
| Round 6+ | Change Order | 4–8 hrs | 4 to 8 hrs | 6 to 12 base-rate hrs equiv. | 8 to 16 base-rate hrs equiv. | Structural rethink. Likely a brief or approval chain problem. |
Before any project goes to contract. Check all items before the first invoice goes out. Unchecked boxes are where scope disputes come from.